Skip to content
Menu
the garage of love
  • Murbella
    • Murbella – Purchase Pics
    • The 2020 Murbella Project
    • The 2020 New Engine
  • Żuczek Brzęczyszczykiewicz
    • Żuczek B. – Purchase Pics
    • The Żuczek Plan
    • 2019 New Build
  • Subaru
  • Engine Work
    • 2020 New Engine
    • 2019 New Engine
  • Reference
    • Engine Building – Short Block
    • Engine Building – Long Block
    • Engine Building – Final Assembly
    • Parts Sourcing
  • About Me
    • Facebook Page
    • Murbella’s Samba Project Thread
the garage of love

Category: Restoration

1979 VW Beetle - Restoration

Murbella – Day 32 – More tin painting. KBS Topcoat!

Posted on 2020-06-01

So I applied the KBS BlackTop Chassis Paint over some of the rust shield. The rust shield product is not UV-resistant, so it needs another coat of this. Yeah. I know. The parts are under the car. But I also hoped to smooth out some of my shoddy brush work. I continued working on some…

1979 VW Beetle - Restored Fuel Injector

Murbella – Day 32 – My injectors arrived back!

Posted on 2020-06-012020-06-01

I am rather out of words and what my cleaned and restored fuel injectors look like. Remember these pics from a few weeks back?   The package I just opened is like magic happened.   Other than some wear on the plastic electronic areas, the injectors look practically brand new! And that Cold Start Valve…

1979 VW Beetle - Restoration

Murbella – Day 32 – KBS (The day after)

Posted on 2020-06-012020-06-01

I thought it would be wise to see how the parts all turned out so I pulled them out into the sun. Let’s just say… an amateur did them and it really really looks like it. There is quite a lot of drip lines since these had to hang. For some reason, there seems to…

1979 VW Beetle - Restoration

Murbella – Day 31 – KBS 2nd coat. Start on a trailing arm.

Posted on 2020-05-312020-05-31

I went with the instructions time frame and put a 2nd coat on the smaller pieces I had done earlier in the day. I taped up the shafts of the axles to clean a clean line. Theoretically, everything that remains bare metal shaft is in the wheel bearing housing and should not be exposed to…

1979 VW Beetle - Restoration

Murbella – Day 31 – Tin work continues.

Posted on 2020-05-31

Work continued today on all of the engine tin. I sat with the orbital sander, trying to roughen up flat areas as well as working out trying to get as much surface corrosion reduced to as minimal as possible. I then sat there hand sanding, trying to get at the areas I cannot easily get…

1979 VW Beetle - Restoration

Murbella – Day 31 – KBS Rust Seal first coat!

Posted on 2020-05-31

Now the trailing arms will be far more difficult to paint by brush given their size and unwieldiness. I fully expect those to take a total of 5 days to get the 2 coats of Rust Seal on and then the KPS top coats on. However, the smaller pieces need to get done and stored…

  • Previous
  • 1
  • 2

Meta

  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
©2026 the garage of love | Powered by SuperbThemes