So my so-called Garage of Love™ is now mostly ready for winter.
During the summer, I more or less like to have both bays free to move around and make a general mess.
I tend to work many days on something, then reset all my tools again and clean up, then start over. Yeah. Sometimes it gets a little too messy and I do feel guilty about that. I really wish I had more space so things didn’t have to lay on top of each order and hand from the ceiling and such but I make do with what I have.
I’ve pulled Murbella in where she’ll sleep. If we have a couple of warmer days in the 70s I may try to get her washed and waxed again.
My son helped me put the still-no-ready-to-be-installed engine over to the other side.
I’ll keep this bay free for now and use it as my work space until it gets too cold to work.
The goal is to get this damn engine running and installed back into Żuczek within the next 2 weeks.
Once that’s done, this space is free to drop Murbella’s engine (aka The AJ Engine Refresh project) and use the space area to stage the refresh it is getting.
I still may pull Murbella out again as I forgot to pull the kerosene heater down from the attic space.