I’m rather shocked. Since my original planning sessions last year I haven’t altered things too much for what I’d like to do in 2019.
The engines need to be the primary early focus of the year, with the immediate goal of getting Żuczek B. and Curious (Yellow) running, stopping, and generally driving. That includes finishing Curious’ brake work.
The AR engine may or may not be rebuilt but it definitely needs to be fully cleaned and the case put away if I’m not going to do anything with it this year.
Major purchases planned are a generator that can handle 240V output, a MIG welder, and assorted miscellaneous tools.
Other work that must occur is garage related and involves getting rid of everything in the attic space and other items not needed for vehicle maintenance.
That space up above has to be where I store the seats and other parts when I start to disassemble Żuczek B.
Oh. And I need to make a dolly can can not only hold Żuczek B’s body up, but also roll over the chassis to allow both the torn down 72 and Murbella in the garage for next winter.